RESILICITY · MineCheck Mine Environmental & ESG Compliance Snapshot

Ewoyaa Lithium Project Lithium

Atlantic Lithium (Barari DV Ghana Ltd) · Central Region, Ghana · generated 2026-06-14 · Resilicity — Dr. Minka Aduse-Poku

A desktop draft of the mine's EIA/ESG conformance — Ghana EPA (Act 490 / LI 1652) mapped against GISTM, IRMA, ICMM, IFC PS, ISSB S2, GRI 14 and TNFD, screened on Ghana-resolution spatial data — with an honest gap register of everything that still needs field data and a registered practitioner's sign-off.

Executive summary

This Snapshot screens Ewoyaa Lithium Project (Atlantic Lithium (Barari DV Ghana Ltd), Lithium) against Ghanaian regulatory requirements and international responsible-mining frameworks. It consolidates land, water, tailings/flood, air and closure screening into one audit-ready draft and a transparent gap register.

● Screening data: LIVE — SafeGround + FloodGuard across 9 concession points, queried 2026-06-14. Findings marked ○ seed are illustrative (no live engine for that aspect).

Addressed (desktop) (1) Partial (20) Gap (3) Needs primary data / sign-off (17)
33%
Desktop-draft readiness
EPA Ghana (LI 1652)47%
Act 703 / Minerals Comm.50%
GISTM12%
ICMM32%
IRMA (2018)38%
IFC PS36%
ISSB IFRS S210%
GRI 14 (2024)38%
TNFD (LEAP)38%
Ghana WRC (Act 522)50%
IFC EHS — Mining15%
Occupational H&S (LI 2182)50%

Readiness = share of framework requirements with desktop/GIS evidence already in place; the remainder need primary data, consultation or sign-off (see the gap register, §6). It is a drafting-progress measure, not a compliance score.

17 requirements need primary data or professional sign-off and are flagged, not assumed conformant. This is decision-support for a registered EIA practitioner — not a substitute for an EIS, field surveys, stakeholder consultation or audit.

1 · Site overview · 9 screening points

MineEwoyaa Lithium ProjectOperatorAtlantic Lithium (Barari DV Ghana Ltd)
CommodityLithiumStatusDevelopment (mining lease granted 2023; Ghana's first lithium mine)
Region / districtCentral Region / Mfantseman Municipal Nearest communityEwoyaa / Mankessim
Mine typeOpen pitProcessingDense-media separation (DMS); flotation for fines — spodumene concentrate (SC6)

⚑ Public-domain demonstration data only. Location approximate; concession envelope illustrative. No operator monitoring data used. For a live Snapshot, ingest the lease polygon, WRC permits and monitoring records.

2 · Lithium commodity profile

Material environmental aspects

Applicable standards

Key ESG indicators

IndicatorUnit / screening benchmark
Water intensitym³ per t SC6 concentrate; report withdrawal, consumption, recycled %
Residue / TSF classificationGISTM consequence category; filtered/dry-stack vs wet TSF
Process chemistryFlotation reagents & flocculants inventory — NO cyanide, NO mercury
Respirable crystalline silicaOccupational + ambient PM; dust-suppression coverage
GHG emissionstCO₂e Scope 1/2/3 per t SC6; energy mix (ISSB S2)
Reclamation provisionBond adequacy vs estimated closure liability
Biodiversity & landFarmland displaced; net change in natural habitat (IFC PS6 / TNFD)
Community grievancesNumber, resolution time; farmland-acquisition compensation
Air qualityPM10 24-h vs Ghana EPA / WHO; haulage-corridor receptors
AMD / ML potentialNet acid generation (NAG) of waste rock; treatment plan

3 · Screening findings by environmental aspect

AspectStatusFinding & evidenceHeadline
Land & community context
SafeGround · ● LIVE
Partial HIGH District: Ajumako-Enyan-Essiam, Central. Screened 9 points across the concession: 0/9 within/near a protected area; 0/9 near a catalogued contamination site. Land tenure, resettlement and grievance status require operator data.
SafeGround /screen — protected-area & contamination layers
⚠ Gap: Cadastral land-tenure records, crop-compensation rates and a livelihood-restoration plan must be supplied by the operator.
Ajumako-Enyan-Essiam, Central
Water resources & riparian
SafeGround · ● LIVE
Partial LOW Concession screened at 9 points. 0/9 within the riparian advisory buffer (nearest ~729 m); 0/9 near mapped wetland; 0/9 in a mapped flood-prone zone. Abstraction/discharge points need WRC permit cross-check.
SafeGround /screen — river/wetland/flood layers
⚠ Gap: WRC abstraction/discharge permit numbers and effluent monitoring data (TSS, pH, residual reagents, metals) required.
Nearest watercourse ~729 m
Fine residue / tailings exposure (GISTM)
FloodGuard · ● LIVE
Needs primary data / sign-off HIGH Live flood-susceptibility screen (national, 250 m grid) at 9 points: worst 'high', mean 0.44; 3/9 points high or above. GISTM consequence classification still needs engineering input.
FloodGuard /api/floodrisk/at — susceptibility grid; DEM-based downstream path screen; IDF extreme-rainfall context
⚠ Gap: Residue facility as-built geometry, deposition method (dry-stack vs wet) and dam-break / stability study required for GISTM conformance.
Max susceptibility high (0.67)
Dust & respirable silica
AirModule · ○ seed
Partial MEDIUM Crushing, screening and haulage dust corridors toward the nearest communities identified; spodumene/host-rock processing raises respirable crystalline silica exposure to manage.
Receptor proximity screen
⚠ Gap: Continuous PM10/PM2.5 and respirable-silica monitoring records and a dust-management plan required.
PM10 receptors within 1 km
Closure & revegetation
ReclamationModule · ○ seed
Partial MEDIUM Progressive rehabilitation footprint and a native-species phytostabilisation / return-to-agriculture revegetation strategy outlined for pits, waste rock and fine-residue surfaces.
Land-disturbance footprint; Native species suitability (GreenInfraPlants)
⚠ Gap: Audited closure cost estimate and reclamation bond adequacy must be confirmed with EPA / Minerals Commission.
Closure liability long-dated

4 · Regulatory & ESG framework conformance matrix

Desktop-derived status. Needs primary data / sign-off marks requirements that cannot be resolved without field data, stakeholder consultation or certification — see the gap register (§6).

EPA Ghana (LI 1652)

ClauseRequirementTopicStatusEvidence source
Reg. 1–3 Registration & screening (Form EA1); mandatory EIA for mining (Schedule 2) Procedure Addressed (desktop) EIA module
Reg. 12 Scoping & Terms of Reference agreed with EPA Procedure Partial EIA module
Reg. 13 Environmental Impact Statement (EIS) content: baseline, impacts, mitigation EIS content Needs primary data / sign-off All modules
Reg. 17 Public hearing / stakeholder consultation record Consultation Needs primary data / sign-off Stakeholder register
Reg. 23 Environmental Management Plan (EMP) & monitoring commitments Management Partial All modules
Reg. 24 Annual Environmental Report & permit renewal Compliance Partial Compliance dashboard

Act 703 / Minerals Comm.

ClauseRequirementTopicStatusEvidence source
Reclamation Reclamation plan & adequacy of reclamation security bond Closure Partial Reclamation module

GISTM

ClauseRequirementTopicStatusEvidence source
Topic I Affected communities — knowledge base & engagement Tailings Needs primary data / sign-off FloodGuard / Stakeholder
Topic II Integrated knowledge base — site characterisation, climate Tailings Needs primary data / sign-off FloodGuard
Topic III Design, construction, operation & monitoring of the TSF Tailings Needs primary data / sign-off Engineering input
Principle 4 Consequence classification & dam-break/inundation assessment Tailings Needs primary data / sign-off FloodGuard
Topic V Emergency preparedness & response (EPRP) for downstream receptors Tailings Needs primary data / sign-off FloodGuard
Topic VI Governance — accountable executive, Independent Tailings Review Board Governance Gap Operator records

ICMM

ClauseRequirementTopicStatusEvidence source
Principle 3 Human rights & free, prior and informed consent (FPIC) Social Needs primary data / sign-off Stakeholder register
Principle 6 Environmental performance — water, biodiversity, pollution Environment Partial SafeGround / Air
Principle 6.3 Cyanide management to ICMI Code
Not applicable to hard-rock lithium: dense-media separation / flotation uses no cyanide or mercury, and there is no artisanal gold-mining mercury interface.
Process Not applicable
Principle 7 Conservation of biodiversity & integrated land-use planning Biodiversity Partial Reclamation module
Principle 9 Social performance — resettlement, grievance mechanism Social Needs primary data / sign-off Stakeholder register

IRMA (2018)

ClauseRequirementTopicStatusEvidence source
2.1 Free, prior & informed consent Social responsibility Needs primary data / sign-off Stakeholder register
3.1 Water management Environmental responsibility Partial SafeGround
3.2 Air quality Environmental responsibility Partial Air module
3.5 Tailings management Environmental responsibility Needs primary data / sign-off FloodGuard
3.6 Cyanide management
Not applicable to hard-rock lithium: dense-media separation / flotation uses no cyanide or mercury, and there is no artisanal gold-mining mercury interface.
Environmental responsibility Not applicable
3.7 Mercury management
Not applicable to hard-rock lithium: dense-media separation / flotation uses no cyanide or mercury, and there is no artisanal gold-mining mercury interface.
Environmental responsibility Not applicable
4.1 Reclamation & closure planning for positive legacy Positive legacy Partial Reclamation module
4.2 Biodiversity & ecosystem services Positive legacy Partial Reclamation module

IFC PS

ClauseRequirementTopicStatusEvidence source
PS1 Assessment & management of environmental & social risks Management Partial All modules
PS3 Resource efficiency & pollution prevention Environment Partial SafeGround / Air
PS4 Community health, safety & security (incl. dam safety) Community Needs primary data / sign-off FloodGuard
PS5 Land acquisition & involuntary resettlement Social Needs primary data / sign-off SafeGround / Stakeholder
PS6 Biodiversity conservation & living natural resources Biodiversity Partial Reclamation module

ISSB IFRS S2

ClauseRequirementTopicStatusEvidence source
Gov/Strat Climate governance, strategy & transition plan Climate Gap Operator disclosure
Metrics Scope 1/2/3 GHG emissions Climate Needs primary data / sign-off Energy inventory
Risk Physical climate risk (extreme rainfall on TSF, water stress) Climate Needs primary data / sign-off FloodGuard

GRI 14 (2024)

ClauseRequirementTopicStatusEvidence source
14.x Tailings management disclosure Sector Needs primary data / sign-off FloodGuard
14.x Water & effluents in mining Sector Partial SafeGround
14.x Closure & rehabilitation Sector Partial Reclamation module
14.x Artisanal & small-scale mining interface
Not applicable to hard-rock lithium: dense-media separation / flotation uses no cyanide or mercury, and there is no artisanal gold-mining mercury interface.
Sector Not applicable

TNFD (LEAP)

ClauseRequirementTopicStatusEvidence source
Locate Interface with nature — habitats & water bodies in/near footprint Nature Partial SafeGround
Evaluate Dependencies & impacts on ecosystem services Nature Partial Reclamation module
Assess Nature-related risks & opportunities Nature Partial Reclamation module
Prepare Response & disclosure (net positive legacy target) Nature Gap Operator disclosure

Ghana WRC (Act 522)

ClauseRequirementTopicStatusEvidence source
Water-use permit Process-water abstraction & discharge permit for DMS / flotation Water Partial SafeGround / WRC

IFC EHS — Mining

ClauseRequirementTopicStatusEvidence source
Residue Filtered / dry-stack fine-residue characterisation, seepage & stability Residue Needs primary data / sign-off Engineering input

Occupational H&S (LI 2182)

ClauseRequirementTopicStatusEvidence source
Silica Respirable crystalline silica exposure control at crushing / DMS Safety Partial Air module

5 · Reclamation & positive-legacy outline

Hard-rock lithium leaves open pits, waste-rock landforms and fine-residue facilities to stabilise and revegetate, on a landscape that was largely farmland and secondary forest. Resilicity's differentiator is a science-based progressive revegetation plan — native Central-Region species selection, substrate amelioration and phytostabilisation of fine residues and waste rock — grounded in Aduse-Poku phytoremediation methodology, with a credible return-to-agriculture / positive-legacy pathway for displaced farming communities.

Indicative native-species palette (phytostabilisation & restoration)

SpeciesRole in the reclamation plan
Chrysopogon zizanioides (vetiver)Phytostabilisation of fine residues; slope & erosion control
Anacardium occidentale (cashew)Return-to-agriculture agroforestry; community livelihood
Azadirachta indica (neem)Hardy pioneer for degraded/dry sites; windbreak
Senna siameaNurse species / fuelwood on disturbed soils
Andropogon gayanusNative grass groundcover; rapid soil stabilisation

Indicative air-quality co-benefit of the restored vegetation

259kg NO₂ / yr
5,702kg PM2.5 / yr
~52cars-worth of NOₓ / yr

Order-of-magnitude screening estimate over ~100 ha of restored vegetation (~300 ha leaf area) using the Aduse-Poku deposition-velocity method (ScienceDirect 2024; Springer Urban Ecosystems 2025). Ambient from live FloodGuard regional data (Ababio 2025). Assumptions: Vd(NO₂)=0.0015 m/s, Vd(PM)=0.002 m/s, LAI=3.0, effective annual fraction=0.5, ambient NO₂=3.65 µg/m³, PM2.5=60.27 µg/m³ over 100 ha restored. Calibrate with site leaf-area index, species-specific Vd and measured ambient concentrations before reporting.

6 · Gap register — what this Snapshot does not replace

4 of 8 items are submission-blocking. A desktop Snapshot is an audit-ready draft; the items below require the operator, field teams and a registered EIA practitioner to close before any regulatory submission.

#AreaWhat is requiredOwnerSeverity
G01 Land & community context Cadastral land-tenure records, crop-compensation rates and a livelihood-restoration plan must be supplied by the operator. Operator / consultant Advisory
G02 Water resources & riparian WRC abstraction/discharge permit numbers and effluent monitoring data (TSS, pH, residual reagents, metals) required. Operator / consultant Advisory
G03 Fine residue / tailings exposure (GISTM) Residue facility as-built geometry, deposition method (dry-stack vs wet) and dam-break / stability study required for GISTM conformance. Operator / consultant BLOCKING
G04 Dust & respirable silica Continuous PM10/PM2.5 and respirable-silica monitoring records and a dust-management plan required. Operator / consultant Advisory
G05 Closure & revegetation Audited closure cost estimate and reclamation bond adequacy must be confirmed with EPA / Minerals Commission. Operator / consultant Advisory
G06 Stakeholder consultation Public hearing & FPIC records are legally required and must be conducted and documented. Consultant / community BLOCKING
G07 Primary baseline surveys Field ecology, hydrology, ambient air and social baseline surveys must be collected. Field teams / labs BLOCKING
G08 Professional certification EIS must be signed by an EPA-registered EIA practitioner; IRMA/GISTM require independent third-party audit. Registered practitioner / auditor BLOCKING